CP 118 pulls down the siding at Heron Bay to meet 113-19's train during a late October snow storm
CP 118 approaches Marathon behind a pair of AC4400CW's
CP AC44's 8117 + 9827 provide the power to reach 55mph at Marathon with a shorter siding length 118.
CP AC4400CW's 9715 + 8601 hustle 118's freight through Marathon on a chilly morning
CP 118 pulls through Marathon